Before the concrete arrived it was important to prepare the plumbing and boxing and make sure that everything was in the right place. The team from Atherton began to lay all the pipes and the Pilacon guys began to build the boxing for the slab. When the steel delivery arrived the mesh was cut to size and installed in preparation for the concrete. See the time-lapse video below, or head to our YouTube channel BarleyStore for the full 5×4 Hayes Lane Project playlist.