Interview with Ralph Alphonso – The Months of November and December 2014

Posted on: December 18th, 2014 by Barley Store

 
With the structure complete, Ralph explains the complex Wall System that is going to keep the 5×4 Building at a stable temperature. (Also includes a quick time-lapse of the luxurious rooftop hot tub being installed on an unusually rainy day!)
 

 
For more video interviews head to our YouTube channel BarleyStore for the full Construction Diary Interviews playlist.
 

Leave a Reply