The insulation began to be stuffed in around the frames on the inside of the building.
The first layer of insulation inside was the insulation batts. We had a mixture of RAMS’s part-wool-part-recycled-polyester batts, and GreenStuf’s 100% recycled polyester batts.
- Interior insulation
- Insulation batts
Once these were in place, a layer of Phase Change Material was stapled over the top, for extra climate control.
- Phase Change Biopcm
- Phase Change and batts
- Phase Change installed
For more information on the Phase Change Material and insulation process, see our Wall Systems section in The Build.