The insulation began to be stuffed in around the frames on the inside of the building.
The first layer of insulation inside was the insulation batts. We had a mixture of RAMS’s part-wool-part-recycled-polyester batts, and GreenStuf’s 100% recycled polyester batts.
Once these were in place, a layer of Phase Change Material was stapled over the top, for extra climate control.
For more information on the Phase Change Material and insulation process, see our Wall Systems section in The Build.