Installing the Floor, Roof and Walls: Day 1

Posted on: October 28th, 2014 by Barley Store

 
The day has come! The walls, floors and roof arrived, with the truck driver from DWTT reversing down our narrow lane-way with his semitrailer.
Melbourne Cranes set up their crane, and began to lift the layers on top of the hollow block work. As with most prefabricated things, we hit a bit of a snag on the first layer, and had to make a few minor adjustments to the first roof/floor, but after that it began to go up smoothly.
 


 
Please also have a look at the time-lapse of the assembly process on our YouTube channel, Barley Store.
 

Leave a Reply