Archive for the ‘Video Diary’ Category

Video Diary: Boxing and Preparing for the Slab

Posted on: September 11th, 2014 by Barley Store

 
Before the concrete arrived it was important to prepare the plumbing and boxing and make sure that everything was in the right place. The team from Atherton began to lay all the pipes and the Pilacon guys began to build the boxing for the slab. When the steel delivery arrived the mesh was cut to size and installed in preparation for the concrete. See the time-lapse video below, or head to our YouTube channel BarleyStore for the full 5×4 Hayes Lane Project playlist.
 

 

Interview with Ralph Alphonso – The Month of August 2014

Posted on: August 31st, 2014 by Barley Store

 
Ralph takes us through the various site activities such as geothermal digging and drilling, as well as running power and water services to site. Meanwhile product testing has begun, with a energy efficient dryer and natural ranges of cosmetics and cleaning products in use. For more video interviews head to our YouTube channel BarleyStore for the full Construction Diary Interviews playlist.
 

Interview with Ralph Alphonso – The Month of July

Posted on: July 31st, 2014 by Barley Store

 
With preparation going on both on and off site, Ralph updates us on the progress of the build – finalising plans, designs and budgets. With the budget blowing out of proportion, some changes need to be made… For more video interviews head to our YouTube channel BarleyStore for the full Construction Diary Interviews playlist.