The day has come! The walls, floors and roof arrived, with the truck driver from DWTT reversing down our narrow lane-way with his semitrailer.
Melbourne Cranes set up their crane, and began to lift the layers on top of the hollow block work. As with most prefabricated things, we hit a bit of a snag on the first layer, and had to make a few minor adjustments to the first roof/floor, but after that it began to go up smoothly.
-
-
Grand Designs got the run-down from Ralph
-
-
Melbourne Cranes at work
-
-
A very impressive truck driver
-
-
Minor alterations
-
-
The first roof going on
-
-
Walls arriving
Please also have a look at the time-lapse of the assembly process on our YouTube channel,
Barley Store.