At the bright and early time of 7am, the excavating and drilling of the holes for the bored piles began. Once we had nine holes, each at 3.5 meters deep, the piles – or cages – were dropped into the holes. The concreter then filled the holes around the cages, leaving us nine piles concreted in place, and a site ready for the boxing for the slab!