Video Diary: Core-filled Block Work

Posted on: October 14th, 2014 by Barley Store

 
Once the slab was down and set, it was time for the breeze-blocks to be laid for the bottom story of the build. These blocks are hollow, and are filled with E-crete for extra stability.


Here’s quick time-lapse of the core-filled block work going up, and then being filled with the e-crete. See the video below, or head to our YouTube channel BarleyStore for the full 5×4 Hayes Lane Project playlist.
 

 

Leave a Reply