The first round of Solar Panels have gone up on the 5×4 Building.
Whilst this is an exciting first step to our sustainable energy production, there is still a long way to go before our solar system is fully up and running.
The roof holds 9 of our proposed 15 solar panels, with the remaining 6 to be installed on the north side of the building in the near future.